πŸ‘‰ How I answer [Valve Authority] in Control Valves


πŸ‘‰ " Three Times Better (Engineer) "

The 3 Things You will learn today are as follows.

➜ One Engineering Learning

Why only Control Valve are less than Line Size and not On-Off valves.

➜ One Engineering Question

What will you do if control valve noise is 90 DBA.

➜ One Career Tip from Top Professionals

If you choose the difficult path then life becomes easy.


Before we start,

If you want to Master and perform "Live" Control Valve Sizing.

Then on 27th and 28th June

We are having a 2 day Valve Sizing Workshop.

For Free.

Join the Whatsapp Community to get the Zoom Link.

Incase, you miss you get the recordings as well.

Lets get to today knowledge sharing email.


#1 -Engineering Learning

Let me ask you a question.

It often appears in tough engineering interviews.

Places like Exxon, Shell, or Qatar Energy.

Why is a control valve smaller than the line?
Is it simply to save costs?

If you answered YES.

Then that answer is entirely incorrect.

Why?


The On-Off Valve Comparison

Let us apply that exact same logic.

We could shrink on-off valves too.

It would definitely save project costs.

But we never do that.

Why?

because Making a control valve smaller... Is done for a completely different reason.

The Science of Pressure Drop

The real answer is pressure drop.

Look at any system with a control valve.

The pressure drop splits into two parts.

  • First, across the control valve.
  • Second, across the surrounding piping.

The ratio between these two parts... Is formally known as Valve Authority.


Why Authority Matters

More pressure drop across the valve?

Means the valve holds more "Authority".

More DP equals better controllability.

So you might ask me:
Why not make the valve as small as possible?

If we make it too small...

System stress becomes dangerously high.

That results in a poorly designed system.

We need to maintain a strict balance.

  • ➜ Pressure across the valve itself.
  • ➜ Pressure across the piping components.

This Valve Authority is critical.

It dictates your valve selection and valve characteristics.


Master Control Valve Sizing

This concept is too deep for one email.

But we cover this in-depth in the 2 day workshop.​

Are you an engineering nerd like me?

Want to design bulletproof control valves?

So nobody can ever question your work?

  1. I am hosting a 2-day workshop on Control Valves.
  2. It is completely free to attend.
  3. Dates: 27th and 28th June.

We skip the basic textbook theory.

We dive right into real valve sizing engineering.

Hop into this WhatsApp notification group.

➜ [Click here to Join the Group]

I will share the Zoom link there.

PS: What if you miss a session?

You will get the full recordings.

But only if you join the WhatsApp group.​

PS: The reason for Whatsapp group is to send the zoom link to only those interested not email to all the 10,000+ of engineers in this email learning community


#2- Engineering Question

Question of this Week

If you control valve noise is 90 DBA and you are working on a UK project.

What will you do ?

Option 1 : Go for Source (Noise) Treatment

Option 2 : Go for Path (Noise) Treatment

Option 3 : Ask Client.

Option 4 : No Action.


#3 -Career Tip

When something sounds technical, I get excited.

Because the more technical something is, there’s nearly always low competition.

And you have the opporunity to shine.

So do the hardwork and learn things others are scared of.

Proud of You !

Keep learning and Growing to be World Class Engineer!!


How was today's learning

  • Highly Valuable : Reply 1
  • Somewhat Valuable : Reply 2
  • Needs Improvement : Reply 3

I see each feedback reply as a gift.


Until next week,

Happy Learning & Keep Smiling.

Asad Shaikh

Your Instrumentation Friend!! 😊

See you next week!

PS: If you would like to Join 2 Day Workshop Control Valve Sizing to master Caviation , Flashing and High Noise then join the Whatsapp Community here.

LBS Road , Mumbai, Maharashtra 400086
​Unsubscribe Β· Preferences​

LBS Road , Mumbai, Maharashtra 400086
​Unsubscribe Β· Preferences​

Asad Shaikh

I'm a youtuber and educator who loves to talk about Instrumentation and Control Engineering. Subscribe and join over 10,000+ newsletter readers every week!

Read more from Asad Shaikh
person holding tool during daytime

πŸ‘‰ " Three Times Better (Engineer) " The 3 Things You will learn are as follows. β€’ My Flowmeter selection Algorithm. β€’ How to Calculate Orifice Straight Length. β€’ How to handle things (You have not done before) #1 -Engineering Question Hello Anti-Copy Paste Engineer, In my career, I have been part of 10,000+ Flowmeters Selection process and today's article is a summary of my entire experience. Below is a bullet point summary, but if you need a detailed PDF summary of Flowmeter Selection (With...

person holding tool during daytime

πŸ‘‰ " Three Times Better (Engineer) " The 3 Things You will learn are as follows. β€’ The 14 Timeless Rules in "Level Sketch". β€’ The best Standard for Level Instrumentation. β€’ Get your shoes "Dirty". #1 -Engineering Question Hello Anti-Copy Paste Engineer, I have made and checked more than 10,000+ Level Sketches in my career and today's article is a summary of my entire experience. Below is a bullet point summary, but if you need a detailed PDF summary of Level Sketch for future reference. Then...

person holding tool during daytime

The 3 Things You will learn today are as follows. The 9 M.A.S.T. Solution in valves. ISO Leakage Standard. You don't need a High IQ to succeed. I know today's email slightly late But trust me. You will find the efforts put into it, highly valuable. So, let's start. The Weakest Link [πŸ”—] All automated valves have a stem. The actuator provides the Torque. The stem transmits this torque. But every stem has a breaking point. MAST- This is the Limit It Stands for M - Maximum A - Allowable S - Stem...